by Rachel Beachy | Oct 15, 2018
Burley Middle School Sections of a masonry wall were removed in Burley Middle School to expand the size of some of the classrooms. A pinch channel was installed to carry the loads from the roof and floor above. The structural work was completed in September and the...
by Rachel Beachy | Sep 19, 2018
CHS Track Expansion This project includes new outdoor bathrooms with cantilever and overhang, complete with sunshade at the Charlottesville High School track. We cantilevered the structure out of an existing building without relying on the existing structure for...
by Rachel Beachy | Aug 13, 2018
Walker Elementary School The main elementary school building has an addition off the back corner of the structure that is the home to additional classrooms. Currently, the two buildings are separated and uncovered from the elements. Engineering Solutions was...