Virginia Tech Temporary Shoring – Blacksburg, VA

Virginia Tech Temporary Shoring – Blacksburg, VA

Virginia Tech Temporary Shoring –  (Blacksburg, VA) When Virginia Tech wanted to renovate and remodel Davidson Hall, Sandy Hall, and the Liberal Arts Building, they needed a way to ensure safety during construction. They contacted us to design temporary shoring...
Trout Unlimited Bridge Design, Part 2

Trout Unlimited Bridge Design, Part 2

Trout Unlimited Bridge Design, Part 2 Last year, the Virginia Council of Trout Unlimited initiated a campaign to conserve, protect, and restore cold-water streams in the valleys and mountains in the Interstate 81 corridor which stretches from Bristol,...
JMU Wind Turbine – Harrisonburg, VA

JMU Wind Turbine – Harrisonburg, VA

JMU Wind Turbine (Harrisonburg, VA) Engineering Solutions team members Christina Merlino and Brian Koerner used a 135-foot personnel lift to access the tower and turbine at James Madison University. The project involved reviewing the existing tower to inspect the...
UVA Pavilion VII Ramp – Charlottesville, VA

UVA Pavilion VII Ramp – Charlottesville, VA

UVA Pavilion VII Ramp (Charlottesville, VA) We worked with UVA’s in-house design group to create an accessible ramp at Pavilion VII – Colonnade Club on UVA’s campus. The structure incorporates an exposed structural steel spine that supports a cantilever beam at each...
UVA JAG School Shelter – Charlottesville, VA

UVA JAG School Shelter – Charlottesville, VA

UVA JAG School Shelter –  (Charlottesville, VA) We worked with UVA’s in-house design group to create a new outdoor classroom for the Judge Advocate General (JAG) program at UVA. The project was unique structurally because we had to maintain a very thin profile...

Pin It on Pinterest