Post Oak Cottage

Post Oak Cottage

Post Oak Cottage This Charlottesville home was completely renovated in 2018. We lofted the ceiling in the living room while keeping the kitchen ceiling flat. We designed a deck and new shearwalls because the existing let in bracing was inadequate for the current...
C&O Row

C&O Row

C&O Row The Charlottesville office has partnered with Evergreen Construction and Atlas Construction to complete the Phase 2 structural design of the C&O Row Houses on Water Street and Phase 3 Townhouses. Phase 2 included Lots 2-7. One lot was designed with a...
Burley Middle School

Burley Middle School

Burley Middle School Sections of a masonry wall were removed in Burley Middle School to expand the size of some of the classrooms. A pinch channel was installed to carry the loads from the roof and floor above. The structural work was completed in September and the...
Quirk Hotel – Charlottesville

Quirk Hotel – Charlottesville

Quirk Hotel – Charlottesville Our Charlottesville office is in the construction administration phase of the Quirk Hotel project. This summer, construction began on the cellar and main levels of the building, with the post tension elevated slab for level 1 and 2...
Walker Elementary School

Walker Elementary School

Walker Elementary School The main elementary school building has an addition off the back corner of the structure that is the home to additional classrooms. Currently, the two buildings are separated and uncovered from the elements. Engineering Solutions was...

Pin It on Pinterest