by Rachel Beachy | Nov 18, 2017
JMU Emergency Alert System Last month James Madison University installed a mass notification system to alert members of the JMU community in case of emergency. Engineering Solutions provided the project management and engineering services required to safely install 4...
by Rachel Beachy | Nov 18, 2017
Keezell Building This was an existing 4-story building built in the early 1900s that housed retail on the first floor and was abandoned on the top floors. The entire building was gutted and renovated. The stairwell wall had to be jacked up from the foundation due to...
by Rachel Beachy | Nov 17, 2017
UVA Pavilion VII Ramp We worked with UVA’s in-house design group to create an accessible ramp at Pavilion VII – Colonnade Club on UVA’s campus. The structure incorporates an exposed structural steel spine that supports a cantilever beam at each reinforced concrete...
by Rachel Beachy | Nov 16, 2017
UVA JAG School Shelter We worked with UVA’s in-house design group to create a new outdoor classroom for the Judge Advocate General (JAG) program at UVA. The project was unique structurally because we had to maintain a very thin profile deck and had no walls or other...